Hethersett Primary School, Norfolk
Size: 19.38 kW
Est. Production: 17,487 Wh pa
CO2 reduction: 9,251 kg pa
Objective: We installed an 19kW solar PV system at Hethersett Primary School in Norfolk.
Equipment used includes 57 JA Solar 340Wp solar panels on a Bauder non penetrative, mounting system and with a 20kW Solis inverter.
The Challenge: was to install using the Bauder PV mounting system. The Bauder fixings are pre installed by a Bauder approved roofer to our layout design, prior to the PV being installed.